Lane control
The lane tool can define connections or block particular paths through a junction.

What we know
Operations schematicConceptual
Locate the first persistent queue
ApproachRoad or rail access
Loading positionService time
DepartureExit clear?
Downstream pathCan the line move?
How to approach the decision
Editorial planning advice based on the confirmed systems above.
- Inspect a single problem movement, then change its connection.
- Watch downstream queues after changing a signal phase.
A mistake to avoid
Giving one movement more time can move the queue to another approach.
What still needs live data
Signal timings, path-choice thresholds and optimal junction layouts.
We will update this guide before opening individual database records. Unverified shells are excluded from search and the sitemap.
Put it to work
Open toolstation throughput
Use your own scenario values. No guessed TF3 presets.
Official sources
Infrastructure dev blogLast editorial review: September 8, 2026. Evidence policy and source ledger.