Road construction
Road tools support continuous building, flexible merges and irregular intersections.

What we know
Operations schematicConceptual
Locate the first persistent queue
ApproachRoad or rail access
Loading positionService time
DepartureExit clear?
Downstream pathCan the line move?
How to approach the decision
Editorial planning advice based on the confirmed systems above.
- Plan the junction footprint before widening its approaches.
- Check actual lane connections after changing road geometry.
A mistake to avoid
A visually connected road does not guarantee your intended turning movement.
What still needs live data
Construction cost, geometry constraints and capacity measurements.
We will update this guide before opening individual database records. Unverified shells are excluded from search and the sitemap.
Put it to work
Open toolstation throughput
Use your own scenario values. No guessed TF3 presets.
Official sources
Infrastructure dev blogLast editorial review: September 8, 2026. Evidence policy and source ledger.